• Home
  • About Us
  • Subscribe
  • Advertise
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • News
    • Latest News
    • Real Estate
    • Q&A
    • Business Profiles
    • Networking
    • Public Record
    • Opinion
      • Our View
  • Real Estate & Construction
    • Latest News
    • Top Properties
    • Building Permits
    • Building Tri-Cities
  • Special Publications
    • Book of Lists
    • Best Places to Work
    • People of Influence
    • Young Professionals
    • Hanford
    • Energy
    • Focus: Agriculture + Viticulture
    • Focus: Construction + Real Estate
  • E-Edition
  • Calendar
    • Calendar
    • Submit an Event
  • Journal Events
    • Senior Times Expo
    • Young Professionals
      • Sponsor Young Professionals
    • Best Places to Work
      • Sponsor BPTW
    • People of Influence
      • Sponsor People of Influence
  • Senior Times
    • About Senior Times
    • Read Senior Times Stories
    • Senior Times Expo
    • Obituaries and Death Notices
Home » Washington clean energy rules ban coal after 2025

Washington clean energy rules ban coal after 2025

Portland General Electric will complete its 10-year plan to mothball the 600 megawatt coal-burning power plant at Boardman, Oregon, by the end of 2020. The end of coal at Boardman is a dramatic shift in energy production in the region.
January 14, 2021
TCAJOB Staff

Washington power providers must remove coal from their portfolios by 2025 under rules adopted by the Washington State Department of Commerce and the Washington Utilities and Transportation Commission.

Commerce regulates 64 publicly-owned utilities, including the public utility districts, cities and rural electric associations that keep the lights on in much of the Mid-Columbia.

The UTC regulates investor-owned utilities.

The rules implement Washington’s Clean Energy Transformation Act, the 2020 law enacted by Gov. Jay Inslee and the Legislature which mandates the state achieve carbon-free power by 2045. Utilities must file plans on how they will comply with the rules by the end of 2021.

The Northwest has already made progress on removing coal from the list of fuels that power the power plants. Burning coal emits carbon dioxide, which contributes to climate change. Four coal plants, including two in Montana and one each in Washington and Oregon, shut down in 2020.

The move from coal and carbon-based fuels such as natural gas will have a minimal impact on the public utilities that serve the Mid-Columbia, which rely heavily on hydro and nuclear power.

The Benton and Franklin public utility districts, Richland Energy Services and Benton Rural Electric Association chiefly draw power from the Bonneville Power Administration, the federal system powered by the Columbia and Snake River dams, the Columbia Generating Station nuclear plant in Richland and other mostly non-carbon sources.

Benton PUD’s fuel mix includes 80% hydropower, 10% nuclear, 0.5% natural gas and 10% wind and “other.”

Franklin PUD’s fuel mix is similar: 81% hydro, 3.23% natural gas, 10% nuclear and 6.23% “unspecified.”

Richland Energy Services’ fuel mix is 87% hydro, 11% nuclear and 2.8% “unspecified.”

Benton REA’s fuel mix is 76% hydro, 10% nuclear and the rest “unspecified.”

The region does have a stake in coal emissions through its proximity to Boardman, Oregon, where Portland General Electric and its minority partner, Idaho Power, operated a 650MW coal plant for generations until it shut down on Oct. 15, 2020.

The clean energy rules spell out how Washington will achieve its goals over the coming years. Broadly, utilities must achieve a carbon-neutral supply of electricity by 2030, and source 100% of their electricity from renewable or non-carbon-emitting sources by 2045.

Details include:
• Utilities must ensure an equitable distribution of benefits from the transition to clean energy for all customers and must make programs and funding available for energy assistance to low-income customers.
• Tax incentives for renewable energy development encourage developers to pay prevailing wages and use a community workforce agreement or project labor agreement.
• Electric utilities must adopt implementation plans by the end of 2021 with targets for achieving CETA’s clean electricity requirements and prepare revised plans every four years.
• By the end of 2025, utilities must remove all coal-fired electric generation from their resource portfolios.
• By 2030, utilities must use a portfolio of electric resources that is greenhouse gas neutral. Under this standard, at least 80% of electricity must be from renewable sources or nuclear power, and any use of natural gas to generate electricity must be offset by emissions reductions elsewhere.
• By 2045, utilities must use a resource portfolio that is 100% renewable or non-emitting to serve Washington customers, with no provision for offsets.

Go to commerce.wa.gov/CETA. A summary of the BPA fuel mix is here: bit.ly/BPAFuelMix.

    Energy Legal
    KEYWORDS january 2021
    Job staff
    TCAJOB Staff

    Fisheries officials: Chinook run higher, sockeye lower

    More from this author
    Free Email Updates

    Daily and Monthly News

    Sign up now!

    Featured Poll

    What's your favorite Tri-Cities summertime event?

    Popular Articles

    • Sterlings
      By Ty Beaver

      This longtime Kennewick restaurant is looking for a new, bigger home

    • Lewis and clark ranch
      By TCAJOB Staff

      Public invited to weigh in on development of West Richland land

    • Voodoo spices and sauces
      By Rachel Visick

      Pasco couple take on local spice business

    • Fiber optic
      By TCAJOB Staff

      Hearing set on Canada company’s acquisition of Ziply Fiber

    • 2025popest
      By TCAJOB Staff

      Tri-City population growth is slowing

    • News Content
      • Latest news
      • Real Estate & Construction
      • Public records
      • Special publications
      • Senior Times
    • Customer Service
      • Our Readers
      • Subscriptions
      • Advertise
      • Editorial calendar
      • Media Kit
    • Connect With Us
      • Submit news
      • Submit an event
      • E-newsletters
      • E-Edition
      • Contact
    • Learn More
      • About Us
      • Our Events
      • FAQs
      • Privacy Policy
      • Spokane Journal of Business

    Mailing Address: 8656 W. Gage Blvd., Ste. C303  Kennewick, WA 99336 USA

    MCM_Horiz.png

    All content copyright © 2025 Mid-Columbia Media Inc. All rights reserved.
    No reproduction, transmission or display is permitted without the written permissions of Mid-Columbia Media Inc.

    Design, CMS, Hosting & Web Development :: ePublishing