• Home
  • About Us
  • Subscribe
  • Advertise
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • News
    • Latest News
    • Real Estate & Construction
    • Q&A
    • Business Profiles
    • Networking
    • Public Record
    • Opinion
      • Our View
    • Energy
    • Healthcare
    • Hanford
    • Education & Training
  • Real Estate & Construction
    • Latest News
    • Top Properties
    • Building Permits
    • Building Tri-Cities
  • Special Publications
    • Book of Lists
    • Best Places to Work
    • People of Influence
    • Young Professionals
    • Hanford
    • Energy
    • Focus: Agriculture + Viticulture
    • Focus: Construction + Real Estate
  • E-Edition
  • Calendar
    • Calendar
    • Submit an Event
  • Sponsored Content
  • Journal Events
    • Senior Times Expo
    • Young Professionals
      • Sponsor Young Professionals
    • Best Places to Work
      • Sponsor BPTW
    • People of Influence
      • Sponsor People of Influence
    • Tri-Cities Workforce Forum
      • Sponsor TC Workforce Forum
  • Senior Times
    • About Senior Times
    • Read Senior Times Stories
    • Senior Times Expo
    • Obituaries and Death Notices
Home » Design team shares vision for future City Hall

Design team shares vision for future City Hall

A rendering of a wood and brick building.

Designers recently shared a concept of two-story brick and timber building with two designated outdoor civic spaces and circular council chambers with a skylight for the new Kennewick City Hall. The building’s design was inspired by other buildings in the downtown core. 

Courtesy City of Kennewick
August 13, 2026
Ty Beaver

The first proposed examples for a new Kennewick City Hall show a two-story brick-and-timber building with two designated outdoor civic spaces and circular council chambers with a skylight.

The Museum at Keewaydin also remains just north of the new City Hall, despite earlier concerns that it would be removed to make way for the municipal building.

Kennewick-City-Hall-2

Coeur d’Alene-based Architects West and Portland-based Opsis recently presented conceptual designs for a new city hall to the Kennewick City Council on July 28.

| Courtesy City of Kennewick

Coeur d’Alene-based Architects West and Portland-based Opsis presented the conceptual designs to the Kennewick City Council on July 28 during its final meeting with council members on the city hall replacement study effort.

The elected officials shared some concerns about the design, with the skylight in the council chambers drawing strong feelings on both sides. The design team stressed that it developed the renderings independently of the council so they could serve as a starting point whenever it decides to move forward.

Designers also gave ballpark figures to complete the project: $29.1 million to $35.5 million for a new 46,000-square foot city hall, or renovate the 60-year-old 39,000-square foot existing structure for between $22.9 million to $25.9 million.

It’s still unclear how much it would cost to relocate city staff during the construction project, which the design team said would be necessary whether the city chooses to build a new building or renovate the current one.

Kennewick-City-Hall-4

Addressing the lack of space and condition of the current city hall has been a priority of the city of Kennewick for the past year. Built 60 years ago, staffing has reached a point where workers are running out of room in the current building, along with needed storage space for files and equipment.

| Courtesy City of Kennewick

Addressing the lack of space and condition of the current City Hall has been a city priority for the past year. Built 60 years ago, staffing has reached a point where workers are running out of room, along with needed storage space for files and equipment. Some expensive maintenance, such as roof repairs, is also needed if the building is to continue being used.

The project has sparked ongoing discussions and controversy, including whether to keep the building on the downtown civic campus or move it elsewhere. Some initial site plans showed a future new city all partly sitting on top of where the Museum at Keewaydin currently sits, causing museum supporters to rally to its defense.

Design team members shared photos of other downtown buildings, many of them in a mid-century modern or historic style, that inspired their initial design.

Kennewick-City-Hall-3

Kennewick city council members shared some concerns about the recently presented conceptual design for a new city hall. The skylight in the council chambers garnering strong feelings on both sides in particular.

| Courtesy City of Kennewick
 

The outdoor spaces are intended to help set the building apart and other features are intended to provide protection from the region’s sometimes intense summer and winter weather as well as winds.

The council took no action at the workshop. City Manager Erin Erdman told the council that she would provide the design team’s final report to council members.

City staff will then seek council consensus on the next steps, such as pursuing a design-build process, as early as the Aug. 18 council meeting.

    Latest News Real Estate & Construction Local News Senior Times Architecture & Engineering Government
    KEYWORDS August 2026
    • Related Articles

      New owners buy one of the three Farmers Exchange buildings

      Kennewick wants more answers before backing new City Hall plan

      Kennewick council zeroes in on City Hall site, putting museum at risk

    • Related Products

      TCJB One Year Print and Online

      TCJB Two Year Print and Online

      TCJB Three Year Print and Online

    Ty ltbkgrnd
    Ty Beaver

    Homebuilder agrees to $1.6M settlement

    More from this author
    Free Email Updates

    Daily and Monthly News

    Sign up now!

    Featured Poll

    What’s your favorite thing to do at the Benton Franklin Fair?

    Popular Articles

    • By Nathan Finke

      Top Property Management Companies

    • Amazon sunset
      By Ty Beaver

      Amazon activates empty Pasco warehouse

    • Mccm renderings outside
      By Ty Beaver

      Children’s museum selects a site

    • Awards
      By TCAJOB Staff

      Two Tri-City companies among fastest growing U.S. companies

    • Slim chickens
      By TCAJOB Staff

      A new spot for your chicken fix is open in Pasco

    • News Content
      • Latest news
      • Real Estate & Construction
      • Public records
      • Special publications
      • Senior Times
    • Customer Service
      • Our Readers
      • Subscriptions
      • Advertise
      • Editorial calendar
      • Media Kit
    • Connect With Us
      • Submit news
      • Submit an event
      • E-newsletters
      • E-Edition
      • Contact
    • Learn More
      • About Us
      • Our Events
      • FAQs
      • Privacy Policy
      • Spokane Journal of Business

    Mailing Address: 8656 W. Gage Blvd., Ste. C303  Kennewick, WA 99336 USA

    MCM_Horiz.png

    All content copyright © 2025 Mid-Columbia Media Inc. All rights reserved.
    No reproduction, transmission or display is permitted without the written permissions of Mid-Columbia Media Inc.

    Design, CMS, Hosting & Web Development :: ePublishing