• Home
  • About Us
  • Subscribe
  • Advertise
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • News
    • Latest News
    • Real Estate
    • Q&A
    • Business Profiles
    • Networking
    • Public Record
    • Opinion
      • Our View
  • Real Estate & Construction
    • Latest News
    • Top Properties
    • Building Permits
    • Building Tri-Cities
  • Special Publications
    • Book of Lists
    • Best Places to Work
    • People of Influence
    • Young Professionals
    • Hanford
    • Energy
    • Focus: Agriculture + Viticulture
    • Focus: Construction + Real Estate
  • E-Edition
  • Calendar
    • Calendar
    • Submit an Event
  • Journal Events
    • Senior Times Expo
    • Young Professionals
      • Sponsor Young Professionals
    • Best Places to Work
      • Sponsor BPTW
    • People of Influence
      • Sponsor People of Influence
    • Tri-Cities Workforce Forum
      • Sponsor TC Workforce Forum
  • Senior Times
    • About Senior Times
    • Read Senior Times Stories
    • Senior Times Expo
    • Obituaries and Death Notices
Home » Petroleum pipeline under Snake River to be replaced

Petroleum pipeline under Snake River to be replaced

Pipeline
July 13, 2025
TCAJOB Staff

Work is expected to begin soon on a replacing a petroleum pipeline crossing underneath the Snake River.  

The Marathon Petroleum Company pipeline crosses beneath the Snake River from Walla Walla County to Pasco. A $2.2 million permit was recently issued by the city of Pasco to replace the 6-inch diameter pipeline using horizontal directional drilling.  

The bore will exit at the existing fuel distribution terminal facility used by Marathon, and about 234 cubic yards of soil will be excavated at the exit pit. After the pipeline is tied in, the excavations will be backfilled with excavated material and/or imported clean material from a local quarry.  

From the Port of Walla Walla jetty where the pipeline enters to the Marathon Terminal on the other side of the river, the pipeline will span about 2,355 feet, according to State Environmental Policy Act documents filed in October 2024. The pipeline will be a minimum of 54 feet below the mudline of the Snake River.  

Tesoro Logistics Operations LLC is the owner, with Michels Trenchless Inc. as the contractor for the project. 

    Latest News Local News Energy
    KEYWORDS July 2025
    • Related Articles

      We must meet the growing energy needs of our communities

      Washington, Idaho Republicans join forces to protect Lower Snake River dams

      Trump revokes memorandum to study breaching of Snake River dams

    • Related Products

      TCJB One Year Print and Online

      TCJB Two Year Print and Online

      TCJB Three Year Print and Online

    Job staff
    TCAJOB Staff

    New pizza restaurant opens in Richland

    More from this author
    Free Email Updates

    Daily and Monthly News

    Sign up now!

    Featured Poll

    What is your biggest business concern heading into 2026?

    Popular Articles

    • Javis chicken  churros 2
      By TCAJOB Staff

      Recent newcomer to Tri-City restaurant scene moving out

    • Solgen1
      By Ty Beaver

      Solgen to lay off employees, close WA operations in 2026

    • July bouten
      By TCAJOB Staff

      Latest Providence layoffs hit Richland, Walla Walla hospitals

    • Complete suite
      By TCAJOB Staff

      Richland furniture gallery closing down

    • Moses lake groff
      By Ty Beaver

      Tri-City builder, architect face lawsuit in school construction project

    • News Content
      • Latest news
      • Real Estate & Construction
      • Public records
      • Special publications
      • Senior Times
    • Customer Service
      • Our Readers
      • Subscriptions
      • Advertise
      • Editorial calendar
      • Media Kit
    • Connect With Us
      • Submit news
      • Submit an event
      • E-newsletters
      • E-Edition
      • Contact
    • Learn More
      • About Us
      • Our Events
      • FAQs
      • Privacy Policy
      • Spokane Journal of Business

    Mailing Address: 8656 W. Gage Blvd., Ste. C303  Kennewick, WA 99336 USA

    MCM_Horiz.png

    All content copyright © 2025 Mid-Columbia Media Inc. All rights reserved.
    No reproduction, transmission or display is permitted without the written permissions of Mid-Columbia Media Inc.

    Design, CMS, Hosting & Web Development :: ePublishing