• Home
  • About Us
  • Subscribe
  • Advertise
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • News
    • Latest News
    • Real Estate
    • Q&A
    • Business Profiles
    • Networking
    • Public Record
    • Opinion
      • Our View
  • Real Estate & Construction
    • Latest News
    • Top Properties
    • Building Permits
    • Building Tri-Cities
  • Special Publications
    • Book of Lists
    • Best Places to Work
    • People of Influence
    • Young Professionals
    • Hanford
    • Energy
    • Focus: Agriculture + Viticulture
    • Focus: Construction + Real Estate
  • E-Edition
  • Calendar
    • Calendar
    • Submit an Event
  • Journal Events
    • Senior Times Expo
    • Young Professionals
      • Sponsor Young Professionals
    • Best Places to Work
      • Sponsor BPTW
    • People of Influence
      • Sponsor People of Influence
    • Tri-Cities Workforce Forum
      • Sponsor TC Workforce Forum
  • Senior Times
    • About Senior Times
    • Read Senior Times Stories
    • Senior Times Expo
    • Obituaries and Death Notices
Home » AtkinsRealis Technology Center (ATC)

AtkinsRealis Technology Center (ATC)

2801 George Washington Way, Richland

Atkins4.jpg
Untitled design - 1
March 15, 2024
Building Tri-Cities advertising

AtkinsRealis Engineering & Technology, US Nuclear recently completed construction of its high-profile office and testing facility in Richland.

The AtkinsRealis Technology Center (ATC) at 2801 George Washington Way will be used for technology development and implementation of robotics, digital, carbon net zero and other environmental solutions.

The building stands kitty-corner from Ste. Michelle Wine Estates WSU Wine Science Center in north Richland.

ATC has 16,000 square feet of collaborative office space and a high-bay testing area designed for developing nuclear and environmental cleanup-related technologies.

The first level is 25,100 square feet and includes two fabrication shops, offices, breakroom, covered patio and a conference room.

The second level is 5,656 square feet and includes offices, conference/meeting rooms and IT/storage area plus a deck. The mezzanine includes 1,972 square feet.

The two-story center features a sky-lit glass-enclosed atrium at the southwest corner surrounded by two-story open air and private office space, including varied “hot desk” workspaces. The company has integrated technology into the design with video conferencing rooms and smart automation lighting, climate control, noise and security.


ATC provides the space and technology needed to think and work differently to co-create, develop and implement solutions that impact the people and communities it serves, AtkinsRealis said.

Design characteristics include a 66-foot high bay exterior which uses light grey three-inch thick insulated metal panel system on top of a 14-foot high split faced charcoal gray CMU block wall.

The two-story 40-foot attached office building exterior is a combination of metallic silver metal siding system over a red brick veneer and a full height south-facing glass storefront window system.

The ATC project was completed in December 2023.

The cost was $13.6 million, including the cost of the land.

The center is a key investment to further develop technology and collaboration among AtkinsRealis’ customers, partners (including Washington State University Tri-Cities), employees and vendors, the company said.

The high bay with 59-foot headroom and an overhead crane was specifically designed for innovative development of nuclear and environmental cleanup technologies, digital solutions, robotics and Engineering Net Zero (ENZ) advancement.

The company said the center is well positioned to support the U.S. Department of Energy’s cleanup goals, including at the Hanford site.

Fowler General Construction Inc. in Richland is the general contractor. Key personnel include Jeff Durfee, Bryan Black, John Payne, Brooks Payne.

Baker Architecture, Bruce Baker, Richland, is the architect.

    Latest News Real Estate & Construction Building Tri-Cities
    KEYWORDS March 2024
    • Related Articles

      Hidden Hills Condominiums

      Burger King

    Btc staff
    Building Tri-Cities advertising

    ICCU Kennewick branch

    More from this author
    Free Email Updates

    Daily and Monthly News

    Sign up now!

    Featured Poll

    What is your biggest business concern heading into 2026?

    Popular Articles

    • Javis chicken  churros 2
      By TCAJOB Staff

      Recent newcomer to Tri-City restaurant scene moving out

    • Solgen1
      By Ty Beaver

      Solgen to lay off employees, close WA operations in 2026

    • July bouten
      By TCAJOB Staff

      Latest Providence layoffs hit Richland, Walla Walla hospitals

    • Complete suite
      By TCAJOB Staff

      Richland furniture gallery closing down

    • Moses lake groff
      By Ty Beaver

      Tri-City builder, architect face lawsuit in school construction project

    • News Content
      • Latest news
      • Real Estate & Construction
      • Public records
      • Special publications
      • Senior Times
    • Customer Service
      • Our Readers
      • Subscriptions
      • Advertise
      • Editorial calendar
      • Media Kit
    • Connect With Us
      • Submit news
      • Submit an event
      • E-newsletters
      • E-Edition
      • Contact
    • Learn More
      • About Us
      • Our Events
      • FAQs
      • Privacy Policy
      • Spokane Journal of Business

    Mailing Address: 8656 W. Gage Blvd., Ste. C303  Kennewick, WA 99336 USA

    MCM_Horiz.png

    All content copyright © 2025 Mid-Columbia Media Inc. All rights reserved.
    No reproduction, transmission or display is permitted without the written permissions of Mid-Columbia Media Inc.

    Design, CMS, Hosting & Web Development :: ePublishing