• Home
  • About Us
  • Subscribe
  • Advertise
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • News
    • Latest News
    • Real Estate & Construction
    • Q&A
    • Business Profiles
    • Networking
    • Public Record
    • Opinion
      • Our View
    • Energy
    • Healthcare
    • Hanford
    • Education & Training
  • Real Estate & Construction
    • Latest News
    • Top Properties
    • Building Permits
    • Building Tri-Cities
  • Special Publications
    • Book of Lists
    • Best Places to Work
    • People of Influence
    • Young Professionals
    • Hanford
    • Energy
    • Focus: Agriculture + Viticulture
    • Focus: Construction + Real Estate
  • E-Edition
  • Calendar
    • Calendar
    • Submit an Event
  • Sponsored Content
  • Journal Events
    • Senior Times Expo
    • Young Professionals
      • Sponsor Young Professionals
    • Best Places to Work
      • Sponsor BPTW
    • People of Influence
      • Sponsor People of Influence
  • Senior Times
    • About Senior Times
    • Read Senior Times Stories
    • Senior Times Expo
    • Obituaries and Death Notices
Home » Real Estate & Construction » Process Water Reuse Facility (PWRF)

Process Water Reuse Facility (PWRF)

957 E. Foster Wells Road, Pasco

default
April 14, 2025
Building Tri-Cities advertising

Pasco recently celebrated the completion of its Process Water Reuse Facility (PWRF) project, built to handle the expansion needs for eight food processors in the area, including Darigold’s new processing plant.

The project includes multiple buildings and treatment structures at 957 E. Foster Wells Road, Pasco, near the intersection of Foster Wells Road and Highway 395.

It encompasses the Pasco Resource Recovery Center (PRRC) on about 34 acres and the addition of 329 million gallons of storage lagoons on about 54 acres.

The PWRF’s primary use is to treat industrial wastewater effluent from the nearby food processors. However, it also turns the wastewater into numerous reusable materials using the principles of industrial symbiosis. It recovers nitrogen from treated wastewater using an algae-based system that can be used in algae-based bioproducts and renewable natural gas, which is sold to Cascade Natural Gas.

The PRRC was built and is owned and operated by Burnham RNG on behalf of the city of Pasco as part of a strategic public private partnership between parties.

The total cost for the improvements was $180 million.

PRRC 3.jpg

The facility can treat up to 8.5 million gallons per day of industrial food processing effluent in two 34 million-gallon anaerobic digesters.

The digesters produce two primary biproducts: biogas, which is piped over to an on-site gas upgrade pad where it is purified to pipeline quality renewable natural gas (RNG), and wastewater, which is then passed through an algae-based nitrogen recovery system.

The fully treated effluent can be stored during the winter months then used for land application on farmland owned by the city.

The project was operational Dec. 31, 2024.

Swinerton Energy served as the general contractor for the construction of the PRRC

Tapani Inc. was the general contractor for the storage lagoons.

Xylem provided engineering design services for the anaerobic digesters, Gross Wenn Technologies provided design for the greenhouse, Biogas Engineering designed the biogas upgrade pad and the balance of plant design and RH2 designed the storage lagoons.

    Real Estate & Construction Building Tri-Cities
    KEYWORDS April 2025
    Btc staff
    Building Tri-Cities advertising

    St. Thomas Plaza

    More from this author

    Stay Informed. It’s Free.

    Subscribe to our newsletters and get the latest news and insights delivered to your inbox.

    Choose the newsletters you’d like to receive:
    Please select at least one newsletter.

    We respect your privacy.
    Unsubscribe anytime.

    Thank you!

    You’re subscribed. Keep an eye on your inbox for the latest updates.

    Featured Poll

    If you had $100 to give back locally, where would it go?

    Popular Articles

    • Avalanche3
      By Ty Beaver

      Fusion startup picks Tri-Cities for advanced nuclear plant

    • Luxury cars
      By Rachel Visick

      Luxury car group buys two Tri-Cities dealerships

    • Prosser memorial mob
      By Ty Beaver

      Demand prompts Prosser to pursue $81M medical center

    • Bldingpermits
      By TCAJOB Staff

      Building Permits – October 2026

    • Strip club
      By Ty Beaver

      New owner buys building once home to casino, strip club

    • News Content
      • Latest news
      • Real Estate & Construction
      • Public records
      • Special publications
      • Senior Times
    • Customer Service
      • Our Readers
      • Subscriptions
      • Advertise
      • Editorial calendar
      • Media Kit
    • Connect With Us
      • Submit news
      • Submit an event
      • E-newsletters
      • E-Edition
      • Contact
    • Learn More
      • About Us
      • Our Events
      • FAQs
      • Privacy Policy
      • Spokane Journal of Business

    Mailing Address: 8656 W. Gage Blvd., Ste. C303  Kennewick, WA 99336 USA

    MCM_Horiz.png

    All content copyright © 2025 Mid-Columbia Media Inc. All rights reserved.
    No reproduction, transmission or display is permitted without the written permissions of Mid-Columbia Media Inc.

    Design, CMS, Hosting & Web Development :: ePublishing